
TSURUMI Vortex Resin Sewage Pump, Automatic 50PUMA2.15S (50mm, 0.15kW)
Irrigation & Watering
HK$2,590.00
No downloads available yet
Contact the supplier if you need a datasheet, certificate, or another technical document.


HK$3,370.00/ 台Was HK$4,810.00-30%
The TSURUMI 50PNI2.75S is a submersible vortex resin sewage pump from Tsurumi's PNI series, with a 50 mm discharge and a 0.75 kW 2-pole single-phase motor. It combines part-specific glass-fibre-reinforced resins with a 304 stainless steel motor frame, so it is compact, light (9.3 kg dry, excluding cable) and corrosion-resistant. The resin semi-vortex impeller is designed for wastewater and sewage carrying small solids, with a 10 mm solids passage.
Because it is lubricated with food-grade liquid paraffin, the 50PNI2.75S suits waterfalls, fountains and koi ponds as well as household, hotel and restaurant wastewater. Its small footprint allows installation in tight spaces such as septic tanks and kitchen wastewater tanks.
Selection note: this is the standard (manual) model and has no float switch. For level-controlled start and stop, add an external float switch or control panel. Tsurumi also makes an AUTO version with a bell-shaped magnetic float and identical performance; contact us if you need it. For lighter, lower-volume duty, consider the smaller OM5 (32 mm, 0.15 kW) or its automatic version, the OMA5. These are sewage pumps, not slurry pumps, and are not suitable for sludge, sand or large solids.
At 50 Hz, the 15.7 m maximum head is the head at near-zero flow, and the 340 L/min (about 20.4 m³/h) maximum capacity is the end point of the performance curve. The two do not occur together: actual flow falls as total head (static head plus hose friction loss) rises. Select the pump from the performance curve using your site's total head.
| Item | Specification |
|---|---|
| General | |
| Model | 50PNI2.75S (standard, manual operation) |
| Series | PNI (vortex resin sewage pump) |
| Discharge bore | 50 mm |
| Discharge connection | Threaded oval flange |
| Hydraulic performance | |
| Max. head (at zero flow) | 15.7 m |
| Max. capacity (curve end point) | 340 L/min (approx. 20.4 m³/h) |
| Solids passage | 10 mm |
| Electrical | |
| Motor output | 0.75 kW |
| Motor | Dry-type submersible induction motor, 2-pole, insulation class E |
| Synchronous speed | 3,000 min⁻¹ (50 Hz) |
| Power supply | Single-phase (voltage as per nameplate) |
| Starting method | Capacitor run |
| Motor protection | Built-in circle thermal protector (CTP) |
| Seals and lubrication | |
| Shaft seal | Dual inside mechanical seals, silicon carbide faces, with Oil Lifter |
| Lubricant | Liquid paraffin (ISO VG32), 240 ml |
| Materials | |
| Impeller | Semi-vortex, glass-fibre-reinforced resin (PPO-GF20) |
| Pump casing | Upper: glass-fibre-reinforced resin (ABS-GF20); lower: ABS |
| Head cover and oil casing | PPS-(MD+GF)50 |
| Strainer and handle | ABS |
| Motor frame | 304 stainless steel |
| Shaft | 403 stainless steel |
| Liquid limits | |
| Liquid | Sewage and wastewater |
| Liquid temperature | 0–40 °C |
| pH | 4–10 |
| Max. submersion depth | 20 m |
| Dimensions and weight | |
| Dimensions (L × W × H) | 241 × 162 × 380 mm |
| Dry weight (excl. cable) | 9.3 kg |
| Lowest running water level | 110 mm |
Sources: Tsurumi PNI series catalogue (IA115) and Tsurumi Europe PNI series data (50 Hz). Voltage, cable and rated current of the Hong Kong supply version are as per the nameplate and confirmation from the Hong Kong agent.
| Model | Discharge | Power | Max. head | Max. capacity | Solids passage | Operation |
|---|---|---|---|---|---|---|
| 50PNI2.75S (this product) | 50 mm | 0.75 kW | 15.7 m | 340 L/min | 10 mm | Manual |
| OM5 | 32 mm | 0.15 kW | 7.5 m | 185 L/min | 10 mm | Manual |
| OMA5 | 32 mm | 0.15 kW | 7.5 m | 185 L/min | 10 mm | Automatic (cylindrical float switch) |