Review the intended use, key features, and technical information supplied for this product.
The Tsurumi 50PNI2.75S is a semi-vortex resin submersible sewage pump from the PNI series. In the model code, "50" is the 50mm (2") discharge bore, "PNI" the vortex-type resin pump series, "2" a 2-pole motor, ".75" the 0.75kW (1HP) motor output and "S" the single-phase version. Designed for wastewater and liquids carrying small solid matter, it uses a semi-open vortex impeller, with impeller and casing in glass fibre reinforced plastic (GFRP) and a 304 stainless steel pump body and motor frame for excellent corrosion resistance. Dry weight is only about 9.3kg, so one person can carry and install it. Liquid paraffin is used as the lubricating oil, extending its use to decorative waterfalls, fishponds and aquaculture.
| Model | 50PNI2.75S |
|---|---|
| Series | PNI vortex-type resin sewage pump |
| Discharge bore | 50mm (2"), inside thread / flange |
| Motor output | 0.75kW (1HP) |
| Motor | 2-pole induction motor, IP68, insulation class E |
| Power supply | 1-phase 230V / 50Hz, capacitor start |
| Rated current | approx. 5.2A |
| Speed | approx. 2,850 rpm (50Hz) |
| Max. head | 15.7m |
| Max. capacity | 340 L/min (approx. 20.4 m³/h) |
| Max. solids handling | 10mm |
| Fluid | Sewage, 0–40°C, pH 4–10 |
| Max. submergence | 20m |
| Lowest running water level | 110mm |
| Impeller | Vortex impeller, glass fibre reinforced plastic |
| Casing | Glass fibre reinforced plastic |
| Pump body / motor frame | Stainless steel EN-X5CrNi18-10 (AISI 304) |
| Shaft | Stainless steel EN-X6Cr13 |
| Mechanical seal | Dual silicon carbide seal in oil bath |
| Bearings | Shielded ball bearings |
| Lubricating oil | Liquid paraffin |
| Motor protection | Built-in thermal cut-out |
| Cable | H07RN8-F 3C×1.0mm², 10m |
| Dry weight | approx. 9.3kg |
| Operation | Manual (float switch optional) |
| Warranty | Provided by the authorised Hong Kong agent |
Specifications are subject to the product nameplate and the manufacturer's technical data.